Inaya Putri Bali offers a wealth of modern hospitality, touched by a sense of place on the beautiful island of Bali. Accommodation is a collection of 457 contemporary styled guest rooms, suites and exclusive villas. The property requires back-up power to ensure the experience for every guest is memorable and exceeds all expectations.
Inaya Putri’s requirement for standby power was up to 200 hours per annum to provide their customers a first class experience. Based on this requirement, Perkins appointed distributor PT Traktor Nusantara suggested a 4012-46TAG2A engine for its dependability and suitability to meet requirements.
The Perkins 4012 range delivers powerful performance, with 12 cylinders and 46 litre displacement providing the necessary reliablity. The diesel engine provides high performance, exceptional efficiency with a compact design.
“The product is very satisfying. Since the time we installed the generator set we have never faced a problem. The proactive service was remarkable and we chose Perkins engines because of their strong network through their appointed distributor, PT Traktor Nusantara.” |
Perkins install a 4012-46TAG2A engine at the Inaya Putri Bali Hotel and Resort.